• We are available for consultancy
  • Main office: Murang’a Town, Next to Family Bank, Mathioya Plaza, First Floor Office No. A10
  • Call us 0736 474 140 / 0736 872 235

Construction and Architectural Services

<

They includes:

  • Reinstatement
  • Concrete/asphalt
  • Trenching
  • Excavation
  • Clearing/Grubbing
  • Drilling
  • Earthworks
  • Cable Laying
We undertake execution of Civil Structural Concrete Construction Works right from foundation stage to the completion stage, which includes erection of form-work, steelwork, concreting. The final stage of job execution includes finishing of the concrete surfaces after de-shuttering, Laying and placing in position the infrastructure for electrical (low & high voltage), plumbing network. Our work for Structural Construction includes Foundations, Substructures and Super Structures. Architectural and Finishing Works
  • Finishing works /placo & painting and laying of marble floors/walls.
  • Granite/Marble fixing on façades, walls and floors
  • Fixing of joinery works like doors windows, Parquet Flooring, Palco work
  • Painting, Tiling, Screeding and Ornamental Work
  • Dry Partitions, False Ceiling.
During the construction phase, we continue to work closely with the owner, architect and all subcontractors to ensure that a project stays on schedule and under budget. After the project is complete, we take every precaution to ensure that the building meets the owner’s expectations. We warranty all of our work for a one-year period, and we perform a mandatory 11-month walk-though, designed to identify any problems or malfunctions that need to be corrected before the warranty expires. Below is a list of services we commonly provide during the preconstruction, construction and post construction phases.
• Identify customer needs and expectations • Define scope of project • Identify project components • Provide monthly progress reports
• Optional activity, to assist in identifying Value Engineering opportunities, Constructability Review, Cost Control & Scheduling.
• Break-out each component of project • Analyze impact areas • Identify cost and project impact • Provide alternative solutions, including cost, schedule and quality impact
• Review construction documents • Evaluate materials, systems and delivery • Identify areas of concern • Involve subcontractors and vendors • Provide alternative solutions • Have team buy off on proposed approach
• Develop conceptual estimate / cost models • Provide detailed cost breakdown • Solicit subcontractor input • Prepare final project cost estimate • Provide cash flow managemen
• Define all construction activities • Prepare preliminary / final CPM schedules • Develop project sequencing plan • Solicit subcontractor input
• Identify all long-lead items • Prequalify equipment and material vendors • Solicit, negotiate, and award contracts • Coordinate equipment packages • Verify and expedite fabrication and delivery
• Develop bid packages for each trade • Hold prequalification interviews • Select three to four qualified bidders • Include owner and architect in selection
• Verify compliance with federal, state and local regulations • Provide project safety plan • Prepare job site security plan
• Develop site staging plan • Coordinate site and building layout • Oversee all mobilization activities
• Coordinate with governmental agencies • Direct project site construction forces • Coordinate all subcontractor activities • Provide survey and layout controls • Hold weekly progress meetings • Submit monthly progress reports
• Provide final master CPM schedule • Update schedule as necessary • Integrate subcontractor schedules
• Coordinate equipment and material packages • Expedite procurement on long lead items • Develop and review shop drawing submittal process • Manage equipment and material deliveries • Receive, unload and store equipment and materials • Provide inventory control
• Competitively bid each bid package • Include owner and architect in bid opening and subcontractor selection • Provide payment process to subcontractors • Scope change analysis and recommendation • Provide monthly project cost reports
• Include specific quality guidelines
• Qualify subcontractors before they
• Evaluate subcontractor workmanship • Conduct appropriate testing • Self-perform concrete work to ensure quality and job performance
• Implement safety program • Hold weekly safety meetings • Train and monitor subcontractor safety • Provide monthly safety report
• Provide certificate of occupancy • Preparation and coordination of all operation manuals and warranties • Introduction to new facility • Facility orientation • Operational and maintenance training
• Immediate response service
• Evaluate equipment and systems • Correct warranty deficiencies